liu.seSök publikationer i DiVA
Ändra sökning
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • oxford
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Proceedings IECON 2012: 38th Annual Conference on IEEE Industrial Electronics Society, Ecole de Technologie Superieure de Montreal, Universite du Quebec Montreal, Canada 25-28 October, 2012
CTS, Uninova, Dep. de Eng. Electrotecnica, Faculdade de Ciencias e Tecnologia, Universidade Nova de Lisboa, 2829-516 Caparica, Portugal.ORCID-id: 0000-0002-0248-8180
CTS, Uninova, Dep. de Eng. Electrotecnica, Faculdade de Ciencias e Tecnologia, Universidade Nova de Lisboa, 2829-516 Caparica, Portugal.
CTS, Uninova, Dep. de Eng. Electrotecnica, Faculdade de Ciencias e Tecnologia, Universidade Nova de Lisboa, 2829-516 Caparica, Portugal.
2012 (Engelska)Ingår i: IECON 2012-38th Annual Conference on IEEE Industrial Electronics Society, 25-28 October, Monteral, Canada, IEEE , 2012, s. 4342-4347Konferensbidrag, Publicerat paper (Refereegranskat)
Resurstyp
Text
Abstract [en]

In recent years a set of production paradigms has emerged to circumvent pressing production challenges. In particular the ability of composing lower order components to form higher order entities with more complex functionalities and reuse them to build yet more complex system has been widely explored. However material handling aspects have been tackled independently of the control/reconfiguration architecture. Traditionally transport resources have been assumed passive and the organization of the production has been treated as a scheduling problems that often ignores disturbances in the transport system. This renders most of the scheduling approaches too theoretical to be applied in real production scenarios and has motivated researchers to pursuit alternative approaches to this sort of production organization problems. In this paper a technical agent-based architecture that integrates control/reconfiguration aspects with material handling is detailed. The architecture supports the simultaneous usage of conveyor and AGV-based material handling systems and the addition of production or material handling resources is handled in a transparent way through careful generic interaction design. Overall the proposed architecture can be applied to any mechatronic system favouring re-configuration and minimizing reprogramming.

Ort, förlag, år, upplaga, sidor
IEEE , 2012. s. 4342-4347
Serie
Annual Conference on IEEE Industrial Electronics Society, ISSN 1553-572X ; 2012
Nationell ämneskategori
Annan teknik
Identifikatorer
URN: urn:nbn:se:liu:diva-125113DOI: 10.1109/IECON.2012.6389190ISBN: 978-1-4673-2419-9 (tryckt)ISBN: 978-1-4673-2420-5 (tryckt)OAI: oai:DiVA.org:liu-125113DiVA, id: diva2:902852
Konferens
IECON 2012-38th Annual Conference on IEEE Industrial Electronics Society
Tillgänglig från: 2016-02-12 Skapad: 2016-02-12 Senast uppdaterad: 2016-02-23Bibliografiskt granskad

Open Access i DiVA

Fulltext saknas i DiVA

Övriga länkar

Förlagets fulltext

Personposter BETA

Ribeiro, Luis

Sök vidare i DiVA

Av författaren/redaktören
Ribeiro, Luis
Annan teknik

Sök vidare utanför DiVA

GoogleGoogle Scholar

doi
isbn
urn-nbn

Altmetricpoäng

doi
isbn
urn-nbn
Totalt: 322 träffar
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • oxford
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf