liu.seSearch for publications in DiVA
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • oxford
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Constructing Costs
Linköping University, Department of Management and Economics.
2000 (Swedish)Independent thesis Advanced level (degree of Magister)Student thesisAlternative title
Constructing Costs (English)
Abstract [en]

The economic analysis of building contracts is an unexplored field within Law and Economics. This paper makes an attempt to cast some light over the subject and encourage to more research within the field. The main purpose has been to describe why the actual price in a public construction project often turns out to be higher than the contract price and offer a way of handle that risk. In the paper a model is set up that shows an optimal contract given expectations on actual price and gaps in contracts. Cost increases for the buyer can mainly be explained by two situations. The first situation is when something unexpected occurs that forces costs to increase for the project as a whole and the risk is already allocated in advance. If the contract specifies that the buyer should bear the current risk it will not cause any procedural problems and the project will end up more expensive for the buyer. The second situation arises when a risk is realised and the contract has not specified how to deal with it. Bargaining power and anticipations on the other parts behaviour will be of significance for how to place the extra costs. A more general discussion is also held about contract forms in the construction sector and the way that different contracts handle financial risk. One conclusion is that a fixed price contract without any gaps probably is the best way for the government to keep control of cost increases. Unfortunately, in the real world almost all contracts suffer from gaps. The paper concludes that cost plus contracts should be used very rarely mainly because of the low incentives it gives the contractor to keep costs down.

Place, publisher, year, edition, pages
Ekonomiska institutionen , 2000. , 33 p.
Series
Master Thesis in Economics, 2000:06
Keyword [en]
Economics, contract, risk, construction
Keyword [sv]
Nationalekonomi
National Category
Economics
Identifiers
URN: urn:nbn:se:liu:diva-643OAI: oai:DiVA.org:liu-643DiVA: diva2:21813
Uppsok
samhälle/juridik
Available from: 2000-06-06 Created: 2000-06-06

Open Access in DiVA

fulltext(119 kB)1949 downloads
File information
File name FULLTEXT01.pdfFile size 119 kBChecksum MD5
fb6629273d2bcb73e080775d3214770fe83fea2614166770b134506ea807aa76cf7a8bf0
Type fulltextMimetype application/pdf

By organisation
Department of Management and Economics
Economics

Search outside of DiVA

GoogleGoogle Scholar
Total: 1949 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 796 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • oxford
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf