Husdeklaration av Stadiums nya distributionscentral
Linköping University, Department of Science and Technology.
2006 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 points / 15 hpStudent thesisAlternative title
Description of Building Materials used in Stadium´s new Distribution Centre (English)
Abstract [en]

The distributioncentral of Stadium has an area of 31,6 acre and is being build in Herstadberg in the region of Norrköping. It is Mattssons Fastighetsutveckling (Mattssons Real-estate development) who also has ordered the building. They will also take care of the operation and support of the distributioncentral. Peab has got the assignment as a total contractor and it is for them I have done my degree project.

I have been drawing-up a description of the goods in the distributioncenter. In the declaration a description of the goods will be found, there substance for all the materials that has been built in to the building describes. All the descriptions of the goods has been put together in folders. If some of the sustance could be found in Peabs list of liquidate and forbidden materials, that can also been seen in the folders. The project should also result in folders for operation and support for the distributioncenter. In the work I have hade many contacts with contractors, assemblers and suppliers. Everybody has helpt me get hold of all the documents I have needed. When it comes to operation and support, many of the bigger contractors and assamblers will put together there own instructions in folders, and then deliver them to the orderer in connection with the final inspection. The documents from from remaining contractors, assemblers and suppliers will I put together in a folder.

After this work I have detected that the head of the contract, who has the responsibility for the declaration of goods dont have the time that needs. A person have to be appointed as responsible for the declaration. A full time employed is not needed, at the most a halftime.

Place, publisher, year, edition, pages
Institutionen för teknik och naturvetenskap , 2006. , 22 p.
Keyword [sv]
Husdeklaration
National Category
Construction Management
Identifiers
URN: urn:nbn:se:liu:diva-6794ISRN: LITH-ITN-EX--06/033--SEOAI: oai:DiVA.org:liu-6794DiVA: diva2:22000
Presentation
2006-06-16, K4503, Kåkenhus, Campus Norrköping, Norrköping, 10:15
Uppsok
teknik
Supervisors
Examiners
Note
Den engelska titeln i uppsatsen (pdf-filen) är felaktig och ska vara "Description of Building Materials used in Stadium´s new Distribution Centre".Available from: 2006-09-01 Created: 2006-09-01

Open Access in DiVA

fulltext(614 kB)863 downloads
File information
File name FULLTEXT01.pdfFile size 614 kBChecksum MD5
e5ddaa0de53d93f7b77b941afc8a648c5c0aa84a477a70ca402ec8f53fa422c7875fe922
Type fulltextMimetype application/pdf

By organisation
Department of Science and Technology
Construction Management

Search outside of DiVA

GoogleGoogle Scholar
Total: 863 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 302 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • oxford
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf