liu.seSearch for publications in DiVA
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • oxford
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Askdeponi i bergrum: Metoder för slurrytillverkning
Linköping University, Department of Management and Engineering, Machine Design . Linköping University, Department of Management and Engineering.
2009 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesisAlternative title
Deposit of Ashes in Rock Shelters : Methods for Slurry Production (Swedish)
Abstract [en]

This thesis work has been carried out at the consultant company Pöyry Sweden AB in Norrköping, whom performs the task for E.ON heating Sweden AB, Händelöverket in Norrköping. The report shows methods to manufacture slurry consisting of fly ash and water. The slurry shall be pumped into several former oil storage rock shelters that E.ON has put into operation for the specific purpose. The ash mixture also develops hydrogen gas in contact with water.The work has aimed to produce different suggestions of methods and equipment that can be used for the objective. Mixing method and security issues were in centre while working with the suggestions. Parts which only indirectly are involved in the slurry manufacturing have been left out.Information has first and foremost been obtained from the Internet and company websites, but also later on through contact with salesmen and persons with knowledge in ash handling. Several references have been investigated. A close visual inspective and thought-provoking educational visit was also conducted.The results of the work are three well-tried main suggestions and one suggestion where a totally different mixing technique is used. Comparable industrial mixing activities are discussed in the beginning of the result chapter, along with some theory in three different mixing technologies. Examples of pumping equipment have also been put together.In the future a lot of work remains. An evaluation of this thesis report should be conducted before the choice of mixing method and equipment is done. Also coordination concerning all sorts of practical and technical details regarding construction work, purchasing and so on, belongs to the work that lies ahead.

Place, publisher, year, edition, pages
2009. , 84 p.
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:liu:diva-19811ISRN: LIU-IEI-TEK-G--09/00127--SEOAI: oai:DiVA.org:liu-19811DiVA: diva2:228994
Presentation
2009-06-05, IKP3, A-huset, Linköping, 00:00 (Swedish)
Uppsok
Technology
Supervisors
Examiners
Available from: 2009-09-01 Created: 2009-08-10 Last updated: 2009-09-01Bibliographically approved

Open Access in DiVA

fulltext(13763 kB)764 downloads
File information
File name FULLTEXT01.pdfFile size 13763 kBChecksum SHA-512
4ef20298566a1f087b3d6f293dfd3c4abf01dfed459e8c9689cab2c8f586ecba332c8831cecfa86d3a92be6de727f0b0b46fe501447f5244c8c8543f56124ce4
Type fulltextMimetype application/pdf

By organisation
Machine Design Department of Management and Engineering
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 764 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 174 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • oxford
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf