Multi-level, multi-stage capacity-constrained production-inventory systems in discrete time with non-zero lead times using MRP theory
Linköping University, Department of Management and Engineering, Production Economics. Linköping University, The Institute of Technology.
Linköping University, The Institute of Technology. Linköping University, Department of Production Economics.
2006 (English)In: International Journal of Production Economics, ISSN 0925-5273, Vol. 101, no 1 SPEC. ISS., 53-62 p.Article in journal (Refereed) Published
Abstract [en]

A substantial amount of research has been carried out on capacity-constrained production-inventory systems. This has mostly dealt with models assuming deterministic demand and single-item systems. In previous work, one of the authors together with a co-researcher designed a basic theoretical model for systems with multiple items and stochastic external demand. These developments were presented within a discrete time framework. Lead times were assumed to be given constants and the net present value principle was applied. Although the theory developed concerned situations in which the lead times could be any non-zero constants, in order to design an analytical solution procedure, the assumption was made that lead times were zero, in order to be able to apply dynamic programming. Cumulative production and cumulative demand were taken as state variables. In this paper, we remain in the discrete time framework and develop a methodology for the case that lead times are non-zero, whereas demand is deterministic. Our emphasis is on the design of the state space, the properties of which depend on the product structures (the input matrix), the distribution of lead times among the production processes (the lead time matrix), and on the historical sequences of the production vectors. Once an efficient state space is designed, dynamic programming may be applied as a solution method. The net present value principle is again applied. © 2005 Elsevier B.V. All rights reserved.

Place, publisher, year, edition, pages
Elsevier, 2006. Vol. 101, no 1 SPEC. ISS., 53-62 p.
National Category
Engineering and Technology
URN: urn:nbn:se:liu:diva-36493DOI: 10.1016/j.ijpe.2005.05.006Local ID: 31450OAI: diva2:257341
Available from: 2009-10-10 Created: 2009-10-10 Last updated: 2012-02-10

Open Access in DiVA

No full text

Other links

Publisher's full text

Search in DiVA

By author/editor
Grubbström, Robert W.Huynh, Thuy
By organisation
Production EconomicsThe Institute of TechnologyDepartment of Production Economics
In the same journal
International Journal of Production Economics
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Altmetric score

Total: 60 hits
ReferencesLink to record
Permanent link

Direct link