Planned lead time determination in a make-to-order remanufacturing system
Linköping University, Department of Management and Engineering, Production Economics. Linköping University, The Institute of Technology.ORCID iD: 0000-0003-3058-7431
Linköping University, Department of Management and Engineering, Production Economics. Linköping University, The Institute of Technology.
Università degli Studi di Brescia, Italy.
2007 (English)In: International Journal of Production Economics, ISSN 0925-5273, E-ISSN 1873-7579, Vol. 108, no 1-2, p. 426-435Article in journal (Refereed) Published
Abstract [en]

In recent years, remanufacturing has emerged as an important research area, due to the tendency of stricter environmental regulations in industry and the awakening to the economic attraction of recovering the products rather than the disposal alternative. This also requires developing manufacturing planning and control techniques to improve the performance of remanufacturing systems. In order to reassemble finished products, new components are required since the recovery rate of return components can never reach 100%. When making a disassembly and procurement decision, we then need to balance the inventory holding cost and stockout cost. In the meantime, the process lead time depends on which disassembly and procurement option that is chosen. In this paper, we study a system where remanufacturing is driven by customer orders. A disassembly order is always released first and then the disassembly result determines whether a purchasing order is needed. Our objective is to examine the process lead time, which can be used to determine the planned lead time in production planning and control of remanufacturing. We start with disassembling a single-component case and then extend the model to a two-component scenario. We also investigate how the disassembly yield influences the system performance. Results of this study are intended to be implemented in a real-world engine remanufacturing environment. © 2007 Elsevier B.V. All rights reserved.

Place, publisher, year, edition, pages
2007. Vol. 108, no 1-2, p. 426-435
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:liu:diva-41762DOI: 10.1016/j.ijpe.2006.12.034Local ID: 59017OAI: oai:DiVA.org:liu-41762DiVA, id: diva2:262617
Available from: 2009-10-10 Created: 2009-10-10 Last updated: 2019-06-27

Open Access in DiVA

No full text in DiVA

Other links

Publisher's full text

Authority records

Tang, OuGrubbström, Robert W.

Search in DiVA

By author/editor
Tang, OuGrubbström, Robert W.
By organisation
Production EconomicsThe Institute of Technology
In the same journal
International Journal of Production Economics
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar

doi
urn-nbn

Altmetric score

doi
urn-nbn
Total: 101 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • oxford
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf