liu.seSearch for publications in DiVA
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • oxford
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Multi-product economic lot scheduling problem with manufacturing and remanufacturing using a basic period policy
University of Brescia.
Luleå University of Technology.
Linköping University, Department of Management and Engineering, Production Economics. Linköping University, The Institute of Technology.
University of Brescia.
2012 (English)In: Computers & industrial engineering, ISSN 0360-8352, E-ISSN 1879-0550, Vol. 62, no 4, 1025-1033 p.Article in journal (Refereed) Published
Abstract [en]

In this research we study the multi-product Economic Lot Scheduling Problem (ELSP) with manufacturing and remanufacturing opportunities. Manufacturing and remanufacturing operations are performed on the same production line. Both manufactured and remanufactured products have the same quality thus they fulfil the same demand stream. Tang and Teunter (2006) firstly studied this type of Economic Lot Scheduling Problem with Returns (ELSPR) and presented a complex algorithm for the optimal solution. More recently Teunter, Tang, and Kaparis (2009) proposed several heuristics to deal with the same problem using more computational efficient approaches. However, both studies have limited the attention to the common cycle policy with the assumption that a single (re)manufacturing lot is used for each item in each cycle. Relaxing the constraint of common cycle time and a single (re)manufacturing lot for each item in each cycle, we propose a simple, easy to implement algorithm, based on Segerstedt (1999), to solve the model using a basic period policy. Several numerical examples show the applicability of the algorithm and the cost savings.

Place, publisher, year, edition, pages
Elsevier , 2012. Vol. 62, no 4, 1025-1033 p.
Keyword [en]
ELSP, Returns, Remanufacturing
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:liu:diva-77534DOI: 10.1016/j.cie.2011.12.030ISI: 000303092500018OAI: oai:DiVA.org:liu-77534DiVA: diva2:528600
Note

Funding Agencies|Italian Ministry of Research and Higher Education||

Available from: 2012-05-28 Created: 2012-05-22 Last updated: 2017-12-07

Open Access in DiVA

fulltext(746 kB)153 downloads
File information
File name FULLTEXT01.pdfFile size 746 kBChecksum SHA-512
760f1117be9d6db3d62648567cfd14a806d234daed8ed7a6fe22431e39295d5ec468153a22e911754b619879e011bc9b1f44bc5239c1738b69ee3f0eb1a4ec10
Type fulltextMimetype application/pdf

Other links

Publisher's full text

Authority records BETA

Tang, Ou

Search in DiVA

By author/editor
Tang, Ou
By organisation
Production EconomicsThe Institute of Technology
In the same journal
Computers & industrial engineering
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 153 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

doi
urn-nbn

Altmetric score

doi
urn-nbn
Total: 106 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • oxford
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf