liu.seSearch for publications in DiVA
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • oxford
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Utvärdering av kvalitén på vatten till anaerobt reningssteg vid kartongproducerande industri: Temperatur, mängd suspenderade ämnen samt flöden på Fiskeby Board AB
Linköping University, Department of Management and Engineering, Energy Systems. Linköping University, The Institute of Technology.
Linköping University, Department of Management and Engineering, Energy Systems. Linköping University, The Institute of Technology.
2014 (Swedish)Independent thesis Advanced level (degree of Master (Two Years)), 20 credits / 30 HE creditsStudent thesisAlternative title
Evaluating water quality for anaerobic treatment plant at a board producing industry : Temperature, amount of suspended solids and flows at Fiskeby Board AB (English)
Abstract [sv]

Fiskeby Board AB har investerat i ett nytt anaerobt reningssteg som ska minska företagets utsläpp och som en positiv bieffekt producera biogas. Syftet med arbetet är att presentera åtgärdsförslag som kan förbättra kvalitén på Fiskebys processavloppsvatten då det ska användas som inflöde till det nya anaeroba reningssteget vars krav processavloppsvattnet inte uppfyller idag. Åtgärdsförslagen ska medföra en ökad temperatur på Fiskebys processavloppsvatten samt en minskad mängd suspenderade ämnen i processavloppsvattnet. För att åstadkomma dessa åtgärdsförslag har mätningar, beräkningar, intervjuer och diskussioner med personal, en litteraturstudie, kartläggning av Fiskebys vatten etc. genomförts. Från detta togs tre åtgärdsförslag fram:

  • Åtgärdsförslag 1: Höja temperaturen på processavloppsvatten med befintlig energi på Fiskeby.
  • Åtgärdsförslag 2: Minska SÄ i processavloppsvatten med ny reningsutrustning.
  • Åtgärdsförslag 3: Säkerställa temperaturen på processavloppsvatten med omkoppling av processvattnet.

I åtgärdsförslag 1 kan sex kylvattenflöden kopplas om till en ny spolvattentank som ersätter dagens spolvatten. Detta medför en ökad energi i spolvattnet och därmed i systemet som helhet motsvarande en medeleffekt av cirka 1000 kW. Positiva bieffekter är en minskad färskvattenförbrukning med 60-70 m3/h (25 %) vid kartongmaskinen, en kostnadsbesparing på bromicidanvändningen med cirka 50 000 SEK/år till följd av minskad färskvattenförbrukning samt minskade utsläpp av kemiskt syreförbrukande ämnen till följd av den minskade färskvattenförbrukningen. I åtgärdsförslag 1 kan även 960 kW överföras från returvattnet till tätningsvattnet med hjälp av en plattvärmeväxlare. Detta medför en ökad energi i tätningsvattnet och i sin tur en ökad energi i vattensystemet som helhet. Båda åtgärderna i åtgärdsförslag 1 är av intresse perioden 1 november – 1 maj då ett effektbehov finns för att erhålla 35 °C på processavloppsvattnet. Kostnaden för att genomföra åtgärderna är inte undersökt.

I åtgärdsförslag 2 presenteras en bågsil och en trumsil som höjer filtreringsgraden från dagens 4 mm till 0,5 mm och på så sätt förbättrar Fiskebys rening av vatten. Kostnaden för en bågsil med kringutrustning är cirka 330 000 SEK och för en trumsil cirka 560 000 SEK. För att minska mängden tungrejekt som hamnar i skivfiltret kan en rundsandfångare eller skrotfälla installeras. Priset för en rundsandfång och skrotfälla som är dimensionerade för Fiskebys flöden är cirka 270 000 SEK vardera. Pilotförsök på respektive reningsutrustning måste genomföras för att erhålla mer specifika resultat på hur mycket utrustningen renar Fiskebys vatten.

I åtgärdsförslag 3 kan en plattvärmeväxlare installeras som överför cirka 1800 kW till processavloppsvattnet för att säkerställa en ständig temperatur på 35 °C. Det negativa med detta åtgärdsförslag är att värmeeffekten tas från processvattnet som direkt påverkar systemtemperaturen och företagets lönsamhet.

Fiskeby bör därför påbörja ett projekteringsarbete med åtgärdsförslag 1 och parallellt utföra pilotförsök på ny reningsutrustning i form av en bågsil eller trumsil.

Abstract [en]

Fiskeby Board AB has invested in a new anaerobic treatment plant that will lower their emissions and as a positive side effect produce biogas. The aim of this project is to present several measures that will improve the quality of Fiskeby’s process wastewater as it will serve as the inflow to the new anaerobic treatment plant and is at the moment not fulfilling the specified requirements set by the anaerobic treatment plant. The measures will lead to a temperature increase of Fiskeby's process wastewater and a lower amount of suspended solids in the process. To achieve these measures discussions and interviews with staff, a literature study, calculations, measurements and a survey of Fiskeby’s water system have been carried out.

  • Proposal 1: Increase the temperature of the process wastewater by using existing energy on Fiskeby.
  • Proposal 2: Lower the amount of suspended solids in the process wastewater with new treatment equipment.
  • Proposal 3: Secure the temperature of the process wastewater by using the process water.

In proposal 1, six cooling water flows can be switched to a new rinsing water tank that will replace the existing rinsing water. This would lead to an increased amount of energy in the rinsing water corresponding to an average power of 1000 kW that will affect the whole water system. In addition to this the fresh water consumption will decrease by 60-70 m3/h or around 25 % of the total fresh water use at ”kartongmaskin1”. A lower amount of bromocid used leads to a saving of 50 000 SEK/year due to the lower fresh water consumption. The lower fresh water consumption also leads to lower COD-emissions (chemical oxygen demand). In proposal 1, 960 kW heat can also be exchanged from the return water to the sealing water with a plate heat exchanger. This would increase the energy in the sealing water but also increase the energy in the whole water system. Both the cooling water proposal and the heat exchanger proposal are of interest from 1st of November – 1st of May when a heat demand is occurring on the process waste water to reach 35 °C. The costs to implement these proposals have not been further investigated.

In proposal 2 a static screen and a drum filter that increases the rate of filtration from the existing 4 mm to 0,5 mm and improves Fiskeby’s treatment process of water are presented. The cost of a static screen is around 330 000 SEK and for a drum filter around 560 000 SEK. To lower the amount of heavy particles that ends up in the disc filter a metal trap or a grit trap can be installed. The cost for a grit trap and metal trap that suits Fiskeby is around 270 000 SEK each. To present more detailed results on how much the equipment cleans the water, a pilot test is needed.

In proposal 3 a plate heat exchanger can be installed and exchange approximately 1800 kW to the process wastewater and thereby secure a temperature of 35 °C for the whole year. The negative part with this proposal is that the heat is taken from the process water which directly affects the system temperature and the profit.

Fiskeby should therefore begin a design work with proposal 1 and in parallel conduct a pilot test on a static screen or a drum filter from proposal 2.

Place, publisher, year, edition, pages
2014. , 85 p.
National Category
Energy Engineering
Identifiers
URN: urn:nbn:se:liu:diva-108718ISRN: LIU-IEI-TEK-A-14/01862-SEOAI: oai:DiVA.org:liu-108718DiVA: diva2:731608
External cooperation
Fiskeby Board AB
Subject / course
Mechanical Engineering
Presentation
2014-06-09, 10:30 (Swedish)
Supervisors
Examiners
Available from: 2014-08-04 Created: 2014-07-01 Last updated: 2014-08-04Bibliographically approved

Open Access in DiVA

fulltext(4910 kB)290 downloads
File information
File name FULLTEXT01.pdfFile size 4910 kBChecksum SHA-512
23bdd0d1e2bcb0dc3a3b54eb707a03ca19bee44f530293c7ea5024ed8835b3483110714b94001e8553a517ef22288dd79a00559e3e490aec73d41b799ab867da
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
Jonsson, NicklasKronqvist, Jonas
By organisation
Energy SystemsThe Institute of Technology
Energy Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 290 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 264 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • oxford
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf