liu.seSearch for publications in DiVA
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • oxford
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Scenarios for Resource Efficient Rail Infrastructure: Applying Integrated Product Service Offerings
Linköping University, Department of Management and Engineering, Environmental Technology and Management. Linköping University, The Institute of Technology.
Linköping University, Department of Management and Engineering, Environmental Technology and Management. Linköping University, The Institute of Technology.
2014 (English)In: PRODUCT SERVICES SYSTEMS AND VALUE CREATION: PROCEEDINGS OF THE 6TH CIRP CONFERENCE ON INDUSTRIAL PRODUCT-SERVICE SYSTEMS, Elsevier, 2014, Vol. 16, 13-139 p.Conference paper, Published paper (Refereed)
Abstract [en]

The rail infrastructure in Sweden, with its long lifetime, large amounts of materials used and traditional procurement, has escalating maintenance costs. What would occur if the infrastructure is instead procured as an Integrated Product Service Offering (IPSO)? This paper discusses scenarios for increased resource efficiency and more value for the money spent by applying an IPSO perspective to rail infrastructure. The best option depends on the conditions at the construction site as well as how much the availability of the tracks is valued.

Place, publisher, year, edition, pages
Elsevier, 2014. Vol. 16, 13-139 p.
Series
Procedia CIRP, ISSN 2212-8271 ; 16
Keyword [en]
Rail infrastructure, maintenance, availability, product service systems
National Category
Environmental Sciences
Identifiers
URN: urn:nbn:se:liu:diva-109977DOI: 10.1016/j.procir.2014.06.001ISI: 000345448900023OAI: oai:DiVA.org:liu-109977DiVA: diva2:741932
Conference
6th CIRP Conference on Industrial Product-Service Systems (IPSS)
Available from: 2014-08-29 Created: 2014-08-29 Last updated: 2015-01-08Bibliographically approved
In thesis
1. Integrated Product Service Offerings for Rail and Road Infrastructure: Reviewing Applicability in Sweden
Open this publication in new window or tab >>Integrated Product Service Offerings for Rail and Road Infrastructure: Reviewing Applicability in Sweden
2014 (English)Doctoral thesis, comprehensive summary (Other academic)
Abstract [en]

This research aims to explore and propose a more effective management of rail and road infrastructure and the possibility of a more resource-efficient road and rail infrastructure by applying business models based on performance and a life-cycle perspective.

There is a lack of efficiency in the Swedish rail and road infrastructure industries - at the same time as the availability of the rail tracks and roads is essential. Rail and road infrastructure have long lifetimes, around 40-60 years, and during these decades regular maintenance and reconstruction are needed to ensure proper function. Large amounts of resources are required to construct the infrastructure, and the overall environmental pressure depends substantially on this.

This research is largely based on interviews conducted with the buyer, contractors and design consultants for rail and road infrastructure in Sweden. Literature reviews have been conducted to develop the framework needed to analyze the empirical findings. This research contributes by building on theory in areas such as Integrated Product Service Offerings (IPSOs) and eco-design, and this abstract presents a brief summary of the overall conclusions.

Several challenges for rail and road infrastructure in Sweden have been identified, such as the lack of information and knowledge transfer between different projects and actors. This is due to e.g. the use of traditional short-term contracts and conservative cooperate cultures, creating sub-optimizations in management. Increased collaboration, through e.g. partnering, seems to be a promising way to increase the information and knowledge transfer between actors by increasing trust and interaction. In this way, management would be more effective, and by involving contractors in the design phase, more efficient technical solutions could be developed and used. Additionally, increased involvement by the design consultants and an iterative information loop between design, construction and maintenance could also be beneficial. The research indicates that increased cooperation increases trust. In this way, there is a possibility to remove the detailed requirements that prevent new ways of working.

Rail and road infrastructure have characteristics, such as the resources used and the importance of availability, that are well-suited for IPSOs. This performance-based business model with a life-cycle perspective provides incentives to optimize the use of resources and provide a holistic view for management that is lacking today for rail and road infrastructure. However, a long-term contract such as an IPSO creates uncertainties. The actors are risk-averse, which is an obstacle in the development of new business models and contract forms. Most of the risks and uncertainties identified are due to lack of experience. This implies that an implementation of IPSOs will have a steep learning curve. Additionally, risk allocation between the actors is important for effective management: too much risk for the suppliers will make them reluctant in developing new solutions, and they will use a risk premium to cover up for the risk.

Place, publisher, year, edition, pages
Linköping: Linköping University Electronic Press, 2014. 106 + Appendix 1 and 2 p.
Series
Linköping Studies in Science and Technology. Dissertations, ISSN 0345-7524 ; 1613
Keyword
Integrated Product Service Offerings, Product Service Systems, long-term contracts, risk, life-cycle perspective, resource-efficiency
National Category
Environmental Sciences Infrastructure Engineering
Identifiers
urn:nbn:se:liu:diva-110015 (URN)10.3384/diss.diva-110015 (DOI)978-91-7519-260-4 (ISBN)
Public defence
2014-09-19, ACAS, A-huset, Campus Valla, Linköpings universitet, Linköping, 10:15 (English)
Opponent
Supervisors
Available from: 2014-09-01 Created: 2014-09-01 Last updated: 2014-09-04Bibliographically approved

Open Access in DiVA

fulltext(470 kB)182 downloads
File information
File name FULLTEXT01.pdfFile size 470 kBChecksum SHA-512
73bbf31e6ad60c343806f06f80527c34cca02d6dc239e800a92909aabf9a57e6092f8b059a53ae586ac1aec8166e4deea51550203216cee0c1755a4232ae1398
Type fulltextMimetype application/pdf

Other links

Publisher's full text

Authority records BETA

Lingegård, SofiaSvensson, Niclas

Search in DiVA

By author/editor
Lingegård, SofiaSvensson, Niclas
By organisation
Environmental Technology and ManagementThe Institute of Technology
Environmental Sciences

Search outside of DiVA

GoogleGoogle Scholar
Total: 182 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

doi
urn-nbn

Altmetric score

doi
urn-nbn
Total: 151 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • oxford
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf