liu.seSearch for publications in DiVA
Endre søk
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • oxford
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
A MILP Model for Rescheduling Freight Trains under an Unexpected Marshalling-Yard Closure
Linköpings universitet, Institutionen för teknik och naturvetenskap, Kommunikations- och transportsystem. Linköpings universitet, Tekniska fakulteten.
Linköpings universitet, Institutionen för teknik och naturvetenskap, Kommunikations- och transportsystem. Linköpings universitet, Tekniska fakulteten.ORCID-id: 0000-0001-6829-8219
Linköpings universitet, Institutionen för teknik och naturvetenskap, Kommunikations- och transportsystem. Linköpings universitet, Tekniska fakulteten.ORCID-id: 0000-0001-6880-8549
Linköpings universitet, Institutionen för teknik och naturvetenskap, Kommunikations- och transportsystem. Linköpings universitet, Tekniska fakulteten.ORCID-id: 0000-0003-2548-5756
2023 (engelsk)Inngår i: Book of Abstracts / [ed] Rob Goverde, Francesco Corman, Ivan Belošević, Sanjin Milinković, The Faculty of Transport and Traffic Engineering, University of Belgrade, Serbia , 2023, s. 68-68Konferansepaper, Oral presentation with published abstract (Annet vitenskapelig)
Abstract [en]

This study is about rescheduling freight trains to reduce the eff ects of major interruptions. In this paper, we consider that the interruption is an unexpected marshallingyard closure. We develop a macroscopic Mixed-Integer Linear Programming (MILP)model to reschedule railway timetables. One important principle is that we simultaneously reschedule several trains, instead of one-by-one. Furthermore, we consider arescheduling strategy of letting trains wait on the way when the destination yard havea closure. The model considers stopping restrictions and the capacity of each segmentand station. The order of the trains aff ected by the interruption is not fi xed. We presentexperimental results of three diff erent cases, which are all based on artifi cial data.

sted, utgiver, år, opplag, sider
The Faculty of Transport and Traffic Engineering, University of Belgrade, Serbia , 2023. s. 68-68
Emneord [en]
Railway timetable rescheduling; Major interruption; Mixed-integer linear programming
HSV kategori
Identifikatorer
URN: urn:nbn:se:liu:diva-194846ISBN: 978-86-7395-467-7 (tryckt)OAI: oai:DiVA.org:liu-194846DiVA, id: diva2:1765766
Konferanse
10th International Conference on Railway Operations Modelling and Analysis (ICROMA), Belgrade, Serbia, April 25th – 28th, 2023
Tilgjengelig fra: 2023-06-12 Laget: 2023-06-12 Sist oppdatert: 2023-12-01

Open Access i DiVA

Fulltekst mangler i DiVA

Andre lenker

Book of Abstracts

Person

Yu, LiyunHäll, Carl HenrikPeterson, AndersSchmidt, Christiane

Søk i DiVA

Av forfatter/redaktør
Yu, LiyunHäll, Carl HenrikPeterson, AndersSchmidt, Christiane
Av organisasjonen

Søk utenfor DiVA

GoogleGoogle Scholar

isbn
urn-nbn

Altmetric

isbn
urn-nbn
Totalt: 283 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • oxford
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf