liu.seSearch for publications in DiVA
Endre søk
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • oxford
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Cost Overruns of Infrastructure Projects – Distributions, Causes and Remedies
Linköpings universitet, Institutionen för teknik och naturvetenskap, Kommunikations- och transportsystem. Linköpings universitet, Tekniska fakulteten. Swedish Transport Administration.ORCID-id: 0000-0003-1789-9238
2024 (engelsk)Manuskript (preprint) (Annet vitenskapelig)
Abstract [en]

This paper analyzes the accuracy of cost estimates for Swedish transport infrastructure projects 2004-2022, discusses causes of cost overruns, and suggests remedies. Cost estimates for all projects in the national investment plans 2010-2022 are tracked from early planning to completion. Final costs for all projects finished 2004-2022 are compared to decision-stage cost estimates. Results show that cost estimates increase considerably during the planning stages, on average, while cost estimates at the final decision stage are close to final costs, on average. Cost escalations during the planning stage are not uniform, however: the distribution of cost changes is highly skewed with a long right tail. The reason that final costs tend to exceed early cost estimates is that project decisions are effectively locked in before projects’ costs and benefits have been thoroughly assessed. Lock-in of premature decisions does not only cause cost overruns; even worse, it distorts project selection and design, reduces incentives to search for more cost-efficient designs, and increases opportunities and incentives for project beneficiaries to underestimate costs and overestimate benefits. Several ways to tackle these problems are suggested. 

sted, utgiver, år, opplag, sider
2024.
Emneord [en]
cost overruns, transport infrastructure, project management, decision processes, transport policy
Identifikatorer
URN: urn:nbn:se:liu:diva-213405DOI: 10.2139/ssrn.5044048OAI: oai:DiVA.org:liu-213405DiVA, id: diva2:1956059
Tilgjengelig fra: 2025-05-05 Laget: 2025-05-05 Sist oppdatert: 2025-05-05

Open Access i DiVA

Fulltekst mangler i DiVA

Andre lenker

Forlagets fulltekst

Person

Eliasson, Jonas

Søk i DiVA

Av forfatter/redaktør
Eliasson, Jonas
Av organisasjonen

Søk utenfor DiVA

GoogleGoogle Scholar

doi
urn-nbn

Altmetric

doi
urn-nbn
Totalt: 87 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • oxford
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf