Adapting the SCOR model to the construction industry settings
Linköpings universitet, Institutionen för teknik och naturvetenskap, Kommunikations- och transportsystem. Linköpings universitet, Tekniska högskolan. (Bygglogistik)
Linköpings universitet, Institutionen för teknik och naturvetenskap, Kommunikations- och transportsystem. Linköpings universitet, Tekniska högskolan. (Bygglogistik)ORCID-id: 0000-0002-8989-4869
2012 (engelsk)Inngår i: Nofoma 2012 - Proceedings of the 24th Annual Nordic Logistics Research Network Conference, 7-8 June, Naantali, Finland / [ed] Juuso Töyli, Laura Johansson, Harri Lorentz, Lauri Ojala and Sini Laari, Åbo, Finland: Turku School of Economics , 2012, , s. 20s. 719-737Konferansepaper, Publicerat paper (Fagfellevurdert)
Abstract [en]

Purpose

The purpose of this paper is to improve construction logistics by introducing an adapted version of the SCOR (Supply Chain Operations and Reference) model. Sub-processes and metrics related to the Deliver and Source processes in the SCOR model that are in need of changes to adapt SCOR to the construction industry settings are identified.

Design/methodology/approach

By observing the Deliver and Source processes and metrics in the SCOR model at a construction site, suggestions for important changes that need to be made to the SCOR model are given. This is done by using case study as a research method for theory building.

Findings

Findings from the case study result in proposals for new Deliver and Source  sub-processes, changes in current sub-processes and new metrics. These changes constitute the first version of the Builder’s SCOR model (BSCOR).

Research limitations/implications

This paper presents the work of finding important changes related to the main processes Deliver (delivery of materials from supplier to site) and Source (receiving materials at site) in the SCOR model. Future work will consider important changes related to the main processes Make, Deliver (from site to customer), Plan and Return.

Originality/value

This paper analyses which parts of the SCOR model that need (or not need) to be adapted to embrace construction industry settings, resulting in a draft of a model based on the SCOR model that comprehends construction industry settings. Accordingly, this can lead to a better adaption of the processes and metrics to map, control, and coordinate the supply chain which can result in an increased profit for construction companies.

sted, utgiver, år, opplag, sider
Åbo, Finland: Turku School of Economics , 2012. , s. 20s. 719-737
Emneord [en]
Construction, Logistics, SCOR, SCM, Metrics
HSV kategori
Identifikatorer
URN: urn:nbn:se:liu:diva-78800ISBN: 978-952-249-204-3 (tryckt)OAI: oai:DiVA.org:liu-78800DiVA, id: diva2:535945
Konferanse
NOFOMA 2012 - The 24th Annual Nordic Logistics Research Network Conference, 7-8 June, Naantali, Finland
Tilgjengelig fra: 2012-06-20 Laget: 2012-06-20 Sist oppdatert: 2016-10-10bibliografisk kontrollert
Inngår i avhandling
1. Towards a Framework for Process Mapping and Performance Measurement in Construction Supply Chains
Åpne denne publikasjonen i ny fane eller vindu >>Towards a Framework for Process Mapping and Performance Measurement in Construction Supply Chains
2013 (engelsk)Licentiatavhandling, med artikler (Annet vitenskapelig)
Abstract [en]

The purpose with this study is to develop a framework for process mapping and performance measurement in construction supply chains. This is done as current literature suggest that many of the problems that cause the cost- and time overruns in construction can be mitigated by implementing supply chain management (SCM) principles. For example, temporary organisations, fragmentation, etc. can affect the time and cost as work and information among members easily are delayed and even distorted. It is also recognised by many authors that planning the construction work and logistics often are tainted with synchronisation and coordination problems between supply chain members. It is deemed necessary with a framework for mapping logistic activities and measuring supply chain performance. Up until now, there exists no framework for mapping the whole construction supply chain and measuring its performance, that encompasses the whole chain from raw material to the finished building.

As stated above, the purpose with this thesis is to develop such a framework. In order to do so an existing framework is used as a basis, the Supply Chain Operations Reference (SCOR) model. The SCOR model consists of five process groups (Plan, Source, Make, Deliver, and Return) hierarchically structured in three levels and some 500 predefined performance metrics. This framework is proven fruitful in other industries but it is also proven by other authors in the field suitable as a basis for a construction adapted version. Other frameworks do exist, but none of these are as comprehensive as the SCOR model. Resent research also suggests that the SCOR model is possible to adjust to unique industry settings. It is identified in this study that the SCOR model has to be adapted to the characteristics of the construction industry. Therefore, the framework presented in this thesis is developed via adaption of the SCOR model to the characteristics of the construction industry. In doing so, a total of four research objectives corresponding to the process groups in the SCOR model are considered for adapting the SCOR model. The Return process, however, is not included in this thesis.

Objective 1. Adapt the SCOR model’s Deliver process to the characteristics of the construction industry.

Objective 2. Adapt the SCOR model’s Source processes to the characteristics of the construction industry.

Objective 3. Adapt the SCOR model’s Make processes to the characteristics of the construction industry.

Objective 4. Adapt the SCOR model’s Plan processes to the characteristics of the construction industry.

The main method utilised in the study is case study research. The results are derived from a total of three case studies. The SCOR model is applied to the cases as it is. Through observing how suitable the framework is for the industry the four aforementioned objectives are addressed. Except from direct observations (with time measurements), other data gathering methods utilised are questionnaires and interviews.

The adapted version of the SCOR model is entitled the Builder’s SCOR model (BSCOR). Findings from the studies indicate that necessary changes to the SCOR model concerns how the material flow in the processes are separated. The SCOR model suggests separating materials based on type of end product (e.g. Make-to-Stock – MTS, Make-to-Order – MTO, or Engineer-to-Order – ETO character). In the BSCOR model, the flow of materials are separated based on who orders them (the main contractor or any of the subcontractors), rather than type of material. The BSCOR model also suggests how the planning process should be organised in order to overcome coordination issues. Finally, one measurement included in the BSCOR model is to keep track of whether an incoming delivery of construction materials is notified in time. An order is not perfectly delivered if it is not notified in time.

One managerial contribution with the study is a framework for mapping supply chain activities and measuring supply chain performance. The framework also offers the ability to measure how the supply chain of a company performs compared to other companies’ supply chains. The study contributes to the academia as it fills the gap of a lack in frameworks suitable for mapping and measuring construction logistics. It also contributes in reporting on the current logistics status in the construction industry.

sted, utgiver, år, opplag, sider
Linköping: Linköping University Electronic Press, 2013. s. 76
Serie
Linköping Studies in Science and Technology. Thesis, ISSN 0280-7971 ; 1631
HSV kategori
Identifikatorer
urn:nbn:se:liu:diva-101964 (URN)10.3384/lic.diva-101964 (DOI)LIU-TEK-LIC-2013:65 (Lokal ID)978-91-7519-462-2 (ISBN)LIU-TEK-LIC-2013:65 (Arkivnummer)LIU-TEK-LIC-2013:65 (OAI)
Presentation
2013-12-06, K3, Kåkenhus, Campus Norrköping, Linköpings universitet, Norrköping, 13:15 (svensk)
Opponent
Veileder
Tilgjengelig fra: 2013-11-25 Laget: 2013-11-25 Sist oppdatert: 2019-12-08bibliografisk kontrollert
2. Developing a Framework for Supply Chain Planning in Construction
Åpne denne publikasjonen i ny fane eller vindu >>Developing a Framework for Supply Chain Planning in Construction
2016 (engelsk)Doktoravhandling, med artikler (Annet vitenskapelig)
Abstract [en]

Supply chain management (SCM) has been stressed as a remedy to many of the underlying issues in the construction industry. However, the positive examples where SCM has been successfully utilised and diminished the lingering issues in construction is scarce. The question is why. Previous studies have stressed the importance of planning both the construction project as such but also the supply chain and the logistics. As an important part of SCM, supply chain planning (SCP) focuses on planning different aspects of the supply chain through involving different members of the supply chain in the planning process. SCP in construction is scarce as the planning of the logistics in general. Failing to plan the supply chain, involving supply chain members in the planning, and integrating the processes of planning the supply chains and the construction project can be one reason for the low numbers of successful SCM adoption in construction. In improving the SCP in construction, this thesis develops a SCP framework for construction that involves the main contractor, subcontractors, and suppliers. The aim is to improve SCP, collaboration, and eliminate many of the common problems in construction through a SCM and SCP perspective.

The developed framework is based on an existing planning framework for sales and operations planning. This framework is generic and synthesises planning in general. It consists of identifying/developing: outcomes, input, organisation, process, key performance measurements, and IT-tools. It is thus necessary to investigate what these aspects means in a construction context. Four research objects will be fulfilled:

Objective 1. Identify common logistical problems and linkages between them

Objective 2. Develop a SCP process

Objective 3. Develop a SCP organisation

Objective 4. Identify performance measurements

sted, utgiver, år, opplag, sider
Linköping: Linköping University Electronic Press, 2016. s. 82
Serie
Linköping Studies in Science and Technology. Dissertations, ISSN 0345-7524 ; 1782
HSV kategori
Identifikatorer
urn:nbn:se:liu:diva-131617 (URN)10.3384/diss.diva-131617 (DOI)9789176857038 (ISBN)
Disputas
2016-11-18, TP2, Täppan, Campus Norrköping, Norrköping, 10:15 (engelsk)
Opponent
Veileder
Merknad

This thesis is funded by Development Fund of the Swedish Construction Industry (SBUF).

Companies that have participated in this work are PEAB, NCC, JM, Arcona,Skanska, Paroc, Vedum, Knauf-Danogips, Bygg-Ole, and Marbodal.

Tilgjengelig fra: 2016-09-28 Laget: 2016-09-28 Sist oppdatert: 2021-12-29bibliografisk kontrollert

Open Access i DiVA

Fulltekst mangler i DiVA

Person

Persson, FredrikThunberg, Micael

Søk i DiVA

Av forfatter/redaktør
Persson, FredrikThunberg, Micael
Av organisasjonen

Søk utenfor DiVA

GoogleGoogle Scholar

isbn
urn-nbn

Altmetric

isbn
urn-nbn
Totalt: 2518 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • oxford
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf