liu.seSearch for publications in DiVA
Endre søk
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • oxford
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Developing an organisation and process for supply chain planning in construction
Linköpings universitet, Institutionen för teknik och naturvetenskap, Kommunikations- och transportsystem. Linköpings universitet, Tekniska fakulteten.ORCID-id: 0000-0002-8989-4869
Linköpings universitet, Institutionen för teknik och naturvetenskap, Kommunikations- och transportsystem. Linköpings universitet, Tekniska fakulteten.ORCID-id: 0000-0001-7494-8134
Linköpings universitet, Institutionen för teknik och naturvetenskap, Kommunikations- och transportsystem. Linköpings universitet, Tekniska fakulteten.
2016 (engelsk)Inngår i: Proceedings from the 23rd EurOMA conference 2016, 19-21st ofJune 2013, Trondheim Norway, 2016Konferansepaper, Publicerat paper (Annet vitenskapelig)
Abstract [en]

Supply chain planning (SCP) can be a facilitator for involving supply chain members in improving operations. Lack of integrating supply chain members has been argued to cause a lack of communication and low productivity. The  purpose is to develop an organisation and process for SCP in construction, which is done via a focus group study with participants from key supply chain  members. The contributions include a suggestion of how to organise SCP in construction, containing inputs, outcomes, process descriptions, meetings, etc. The main outcome of the SCP process is a balanced material delivery schedule, updated regularly, integrating supply chain members.

sted, utgiver, år, opplag, sider
2016.
Emneord [en]
Construction, Supply chain management, Supply chain planning
HSV kategori
Identifikatorer
URN: urn:nbn:se:liu:diva-131616OAI: oai:DiVA.org:liu-131616DiVA, id: diva2:974912
Konferanse
23rd EurOMA conference 2016, 19-21st of June 2013, Trondheim Norway
Tilgjengelig fra: 2016-09-28 Laget: 2016-09-28 Sist oppdatert: 2021-12-29bibliografisk kontrollert
Inngår i avhandling
1. Developing a Framework for Supply Chain Planning in Construction
Åpne denne publikasjonen i ny fane eller vindu >>Developing a Framework for Supply Chain Planning in Construction
2016 (engelsk)Doktoravhandling, med artikler (Annet vitenskapelig)
Abstract [en]

Supply chain management (SCM) has been stressed as a remedy to many of the underlying issues in the construction industry. However, the positive examples where SCM has been successfully utilised and diminished the lingering issues in construction is scarce. The question is why. Previous studies have stressed the importance of planning both the construction project as such but also the supply chain and the logistics. As an important part of SCM, supply chain planning (SCP) focuses on planning different aspects of the supply chain through involving different members of the supply chain in the planning process. SCP in construction is scarce as the planning of the logistics in general. Failing to plan the supply chain, involving supply chain members in the planning, and integrating the processes of planning the supply chains and the construction project can be one reason for the low numbers of successful SCM adoption in construction. In improving the SCP in construction, this thesis develops a SCP framework for construction that involves the main contractor, subcontractors, and suppliers. The aim is to improve SCP, collaboration, and eliminate many of the common problems in construction through a SCM and SCP perspective.

The developed framework is based on an existing planning framework for sales and operations planning. This framework is generic and synthesises planning in general. It consists of identifying/developing: outcomes, input, organisation, process, key performance measurements, and IT-tools. It is thus necessary to investigate what these aspects means in a construction context. Four research objects will be fulfilled:

Objective 1. Identify common logistical problems and linkages between them

Objective 2. Develop a SCP process

Objective 3. Develop a SCP organisation

Objective 4. Identify performance measurements

sted, utgiver, år, opplag, sider
Linköping: Linköping University Electronic Press, 2016. s. 82
Serie
Linköping Studies in Science and Technology. Dissertations, ISSN 0345-7524 ; 1782
HSV kategori
Identifikatorer
urn:nbn:se:liu:diva-131617 (URN)10.3384/diss.diva-131617 (DOI)9789176857038 (ISBN)
Disputas
2016-11-18, TP2, Täppan, Campus Norrköping, Norrköping, 10:15 (engelsk)
Opponent
Veileder
Merknad

This thesis is funded by Development Fund of the Swedish Construction Industry (SBUF).

Companies that have participated in this work are PEAB, NCC, JM, Arcona,Skanska, Paroc, Vedum, Knauf-Danogips, Bygg-Ole, and Marbodal.

Tilgjengelig fra: 2016-09-28 Laget: 2016-09-28 Sist oppdatert: 2021-12-29bibliografisk kontrollert

Open Access i DiVA

Fulltekst mangler i DiVA

Søk i DiVA

Av forfatter/redaktør
Thunberg, MicaelFredriksson, AnnaRudberg, Martin
Av organisasjonen

Søk utenfor DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric

urn-nbn
Totalt: 1203 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • oxford
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf