Developing a Framework for Supply Chain Planning in Construction
Linköpings universitet, Institutionen för teknik och naturvetenskap, Kommunikations- och transportsystem. Linköpings universitet, Tekniska fakulteten.ORCID-id: 0000-0002-8989-4869
2016 (engelsk)Doktoravhandling, med artikler (Annet vitenskapelig)
Abstract [en]

Supply chain management (SCM) has been stressed as a remedy to many of the underlying issues in the construction industry. However, the positive examples where SCM has been successfully utilised and diminished the lingering issues in construction is scarce. The question is why. Previous studies have stressed the importance of planning both the construction project as such but also the supply chain and the logistics. As an important part of SCM, supply chain planning (SCP) focuses on planning different aspects of the supply chain through involving different members of the supply chain in the planning process. SCP in construction is scarce as the planning of the logistics in general. Failing to plan the supply chain, involving supply chain members in the planning, and integrating the processes of planning the supply chains and the construction project can be one reason for the low numbers of successful SCM adoption in construction. In improving the SCP in construction, this thesis develops a SCP framework for construction that involves the main contractor, subcontractors, and suppliers. The aim is to improve SCP, collaboration, and eliminate many of the common problems in construction through a SCM and SCP perspective.

The developed framework is based on an existing planning framework for sales and operations planning. This framework is generic and synthesises planning in general. It consists of identifying/developing: outcomes, input, organisation, process, key performance measurements, and IT-tools. It is thus necessary to investigate what these aspects means in a construction context. Four research objects will be fulfilled:

Objective 1. Identify common logistical problems and linkages between them

Objective 2. Develop a SCP process

Objective 3. Develop a SCP organisation

Objective 4. Identify performance measurements

sted, utgiver, år, opplag, sider
Linköping: Linköping University Electronic Press, 2016. , s. 82
Serie
Linköping Studies in Science and Technology. Dissertations, ISSN 0345-7524 ; 1782
HSV kategori
Identifikatorer
URN: urn:nbn:se:liu:diva-131617DOI: 10.3384/diss.diva-131617ISBN: 9789176857038 (tryckt)OAI: oai:DiVA.org:liu-131617DiVA, id: diva2:974919
Disputas
2016-11-18, TP2, Täppan, Campus Norrköping, Norrköping, 10:15 (engelsk)
Opponent
Veileder
Merknad

This thesis is funded by Development Fund of the Swedish Construction Industry (SBUF).

Companies that have participated in this work are PEAB, NCC, JM, Arcona,Skanska, Paroc, Vedum, Knauf-Danogips, Bygg-Ole, and Marbodal.

Tilgjengelig fra: 2016-09-28 Laget: 2016-09-28 Sist oppdatert: 2021-12-29bibliografisk kontrollert
Delarbeid
1. Using the SCOR model’s performance measurements to improve construction logistics
Åpne denne publikasjonen i ny fane eller vindu >>Using the SCOR model’s performance measurements to improve construction logistics
2014 (engelsk)Inngår i: Production planning & control (Print), ISSN 0953-7287, E-ISSN 1366-5871, Vol. 25, nr 13/14, s. 1056-1078Artikkel i tidsskrift (Fagfellevurdert) Published
Abstract [en]

In this paper, construction material supplier and construction site performance are assessed according to the supply chain operations reference (SCOR) model. Current applicable literature focuses mainly on assessing the main contractor’s ability to construct a building according to customer requirements, i.e. construction performance. Omitting supplier performance when evaluating construction performance reduces the ability to improve the construction supply chain, as reasons for cost and time overruns and quality deficiencies will often be overlooked. In this paper, the SCOR metrics perfect order fulfilment (POF), source cycle time (SCT) and cost to source(CS) are measured to assess construction supplier reliability and construction site responsiveness. The values for POF, SCT and CS are measured to be 38%, 134 min and EUR 249, respectively. The practical implications are summarised in five improvement suggestions concerning communication, predefined material allocation, supplier performance assessment, delivery verification and notification and use of the SCOR model.

sted, utgiver, år, opplag, sider
Taylor & Francis, 2014
Emneord
construction industry, construction logistics, construction SCM, performance measurement, SCOR
HSV kategori
Identifikatorer
urn:nbn:se:liu:diva-96788 (URN)10.1080/09537287.2013.808836 (DOI)000343288400002 ()
Tilgjengelig fra: 2013-08-27 Laget: 2013-08-27 Sist oppdatert: 2017-12-06
2. Adapting the SCOR model to the construction industry settings
Åpne denne publikasjonen i ny fane eller vindu >>Adapting the SCOR model to the construction industry settings
2012 (engelsk)Inngår i: Nofoma 2012 - Proceedings of the 24th Annual Nordic Logistics Research Network Conference, 7-8 June, Naantali, Finland / [ed] Juuso Töyli, Laura Johansson, Harri Lorentz, Lauri Ojala and Sini Laari, Åbo, Finland: Turku School of Economics , 2012, , s. 20s. 719-737Konferansepaper, Publicerat paper (Fagfellevurdert)
Abstract [en]

Purpose

The purpose of this paper is to improve construction logistics by introducing an adapted version of the SCOR (Supply Chain Operations and Reference) model. Sub-processes and metrics related to the Deliver and Source processes in the SCOR model that are in need of changes to adapt SCOR to the construction industry settings are identified.

Design/methodology/approach

By observing the Deliver and Source processes and metrics in the SCOR model at a construction site, suggestions for important changes that need to be made to the SCOR model are given. This is done by using case study as a research method for theory building.

Findings

Findings from the case study result in proposals for new Deliver and Source  sub-processes, changes in current sub-processes and new metrics. These changes constitute the first version of the Builder’s SCOR model (BSCOR).

Research limitations/implications

This paper presents the work of finding important changes related to the main processes Deliver (delivery of materials from supplier to site) and Source (receiving materials at site) in the SCOR model. Future work will consider important changes related to the main processes Make, Deliver (from site to customer), Plan and Return.

Originality/value

This paper analyses which parts of the SCOR model that need (or not need) to be adapted to embrace construction industry settings, resulting in a draft of a model based on the SCOR model that comprehends construction industry settings. Accordingly, this can lead to a better adaption of the processes and metrics to map, control, and coordinate the supply chain which can result in an increased profit for construction companies.

sted, utgiver, år, opplag, sider
Åbo, Finland: Turku School of Economics, 2012. s. 20
Emneord
Construction, Logistics, SCOR, SCM, Metrics
HSV kategori
Identifikatorer
urn:nbn:se:liu:diva-78800 (URN)978-952-249-204-3 (ISBN)
Konferanse
NOFOMA 2012 - The 24th Annual Nordic Logistics Research Network Conference, 7-8 June, Naantali, Finland
Tilgjengelig fra: 2012-06-20 Laget: 2012-06-20 Sist oppdatert: 2016-10-10bibliografisk kontrollert
3. Developing an organisation and process for supply chain planning in construction
Åpne denne publikasjonen i ny fane eller vindu >>Developing an organisation and process for supply chain planning in construction
2016 (engelsk)Inngår i: Proceedings from the 23rd EurOMA conference 2016, 19-21st ofJune 2013, Trondheim Norway, 2016Konferansepaper, Publicerat paper (Annet vitenskapelig)
Abstract [en]

Supply chain planning (SCP) can be a facilitator for involving supply chain members in improving operations. Lack of integrating supply chain members has been argued to cause a lack of communication and low productivity. The  purpose is to develop an organisation and process for SCP in construction, which is done via a focus group study with participants from key supply chain  members. The contributions include a suggestion of how to organise SCP in construction, containing inputs, outcomes, process descriptions, meetings, etc. The main outcome of the SCP process is a balanced material delivery schedule, updated regularly, integrating supply chain members.

Emneord
Construction, Supply chain management, Supply chain planning
HSV kategori
Identifikatorer
urn:nbn:se:liu:diva-131616 (URN)
Konferanse
23rd EurOMA conference 2016, 19-21st of June 2013, Trondheim Norway
Tilgjengelig fra: 2016-09-28 Laget: 2016-09-28 Sist oppdatert: 2021-12-29bibliografisk kontrollert

Open Access i DiVA

Developing a Framework for Supply Chain Planning in Construction(1708 kB)14946 nedlastinger
Filinformasjon
Fil FULLTEXT01.pdfFilstørrelse 1708 kBChecksum SHA-512
ed33f3ab14428996d89b9c52578856a851801713a48e5293cbc3a6d54d567409abede73b5ec37b263109346bfdd4427a4bde027a71c475a13bec0c0eb9124f51
Type fulltextMimetype application/pdf
omslag(21 kB)132 nedlastinger
Filinformasjon
Fil COVER01.pdfFilstørrelse 21 kBChecksum SHA-512
0a4c1e2f67ac6643077e3552a49bb57b8a6e88ea7d3e8f4fc0684cc198217bccc543419e10af8b6c2d828b130c9ebe1ac80c1384e4bad2a5faa329cb28ca6146
Type coverMimetype application/pdf
Bestill online >>

Andre lenker

Forlagets fulltekst

Søk i DiVA

Av forfatter/redaktør
Thunberg, Micael
Av organisasjonen

Søk utenfor DiVA

GoogleGoogle Scholar
Totalt: 14993 nedlastinger
Antall nedlastinger er summen av alle nedlastinger av alle fulltekster. Det kan for eksempel være tidligere versjoner som er ikke lenger tilgjengelige

doi
isbn
urn-nbn

Altmetric

doi
isbn
urn-nbn
Totalt: 4452 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • oxford
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf