Effects of employing third-party logistics arrangements in construction projects
Linköping University, Department of Science and Technology, Communications and Transport Systems. Linköping University, Faculty of Science & Engineering. (Bygglogistik)ORCID iD: 0000-0003-0693-8537
Linköping University, Department of Science and Technology, Communications and Transport Systems. Linköping University, Faculty of Science & Engineering.ORCID iD: 0000-0003-1066-2094
2022 (English)In: Production planning & control (Print), ISSN 0953-7287, E-ISSN 1366-5871, Vol. 33, no 1, p. 71-83Article in journal (Refereed) Published
Abstract [en]

Third-party logistics (TPL) arrangements are becoming a regular occurrence in urban construction projects. The industry is, however, still apprehensive regarding the effects that TPL arrangements bring. The purpose of this study is therefore to investigate the effects that can be realised when employing a logistics arrangement in construction, including possible benefits, concerns, and effects on cost elements. The purpose is fulfilled through a case study of a large construction project in Sweden that has employed a TPL arrangement. Results show that there are positive effects to achieve in terms of logistics performance and project performance, but that the main challenge to achieve these effects is to include all supply chain actors to reach a higher level of SCM maturity. This inclusion can be achieved through a better dialogue amongst supply chain actors to create an understanding for why TPL is employed and why policies and regulations needs to be followed.

Place, publisher, year, edition, pages
Taylor & Francis Group, 2022. Vol. 33, no 1, p. 71-83
Keywords [en]
Construction management, supply chain management, logistics, third-party logistics, case study
National Category
Transport Systems and Logistics
Identifiers
URN: urn:nbn:se:liu:diva-170092DOI: 10.1080/09537287.2020.1821925ISI: 000569446400001Scopus ID: 2-s2.0-85091094166OAI: oai:DiVA.org:liu-170092DiVA, id: diva2:1471477
Funder
Svenska Byggbranschens Utvecklingsfond (SBUF), 12902Available from: 2020-09-29 Created: 2020-09-29 Last updated: 2022-10-24Bibliographically approved
In thesis
1. Construction Logistics in a City Development Setting
Open this publication in new window or tab >>Construction Logistics in a City Development Setting
2020 (English)Doctoral thesis, comprehensive summary (Other academic)
Abstract [en]

With the current urbanization trend, there is an increased need for city development, i.e. to build apartment buildings, hospitals, schools and infrastructure in cities and urban areas to meet the rising demands. At the same time, land is increasingly seen as a finite resource. This has led to the regeneration of decommissioned industrial-use land for development purposes. This means that multiple individual construction projects are being built in the same or nearby areas during the same time-period. However, the end products of construction projects are produced at their place of consumption, which means that large quantities of materials and resources need to be delivered to, and removed from, each construction site. This leads to new transport flows being created in connection to city development. These transport flows need to be coordinated to ensure efficient construction productivity and reduce the transports’ environmental and social impact on the urban transport system. At the same time, it is important to ensure that construction sites can be managed from a logistics perspective without impairing efficiency due to the challenges of building in urban environments.

One way of managing logistics to and from construction projects in city development is through so-called construction logistics setups (CLS). However, the implementation of CLS’s affect many different stakeholders and the interorganizational relationships between them. The implementation of CLS’s therefore faces three challenges; management of transport to and from construction sitesmanagement of logistics at construction sites, and managing the interorganizational relationships amongst construction project stakeholders. The development of CLS’s is often undertaken by mimicking previous setups as there is currently no guiding procedure for developing and implementing CLS’s. To reduce the ad hoc approach to developing and implementing CLS’s, the purpose of this dissertation is to propose a framework for developing construction logistics setups. The purpose is fulfilled with the aid of the following four research questions:

RQ1:   Taking the perspectives of different stakeholders’, why are CLS’s implemented?

RQ2:   What type of CLS services are offered?

RQ3:   How can performance effects of CLS’s be measured?

RQ4:   How do CLS’s affect the identified challenges of managing the transports to and from construction sitesmanaging logistics at construction sites, and managing the interorganizational relationships amongst construction project stakeholders?

To answer the research questions, three main methodologies have been used; literature reviews to inform the background of the studies and develop analytical frameworks, and case study and Delphi research for the empirical studies. 

In fulfilling the research purpose, the findings of this dissertation suggests that when developing a CLS, three activities need to be considered; 1. setting the scope of the CLS, 2. deciding on the structure of the CLS, and 3. managing the interorganizational relationships of the CLS. These activities are the foundation of the developed framework. The contents of the activities were derived through the research questions.

When answering RQ1, it was found that contractors implement CLS’s to ensure construction productivity, developers implement CLS’s to reduce disturbances to businesses and residents nearby, and municipalities implement CLS’s to reduce disturbances to third-parties and to reduce the impact from construction logistics on the urban transport system. These stakeholder drivers for implementing CLS’s will impact the scope of the CLS. Furthermore, the scope of the CLS was found to be dependent on both the contextual considerations of the CLS in terms of physical context at site and in terms of what is being built, as well as the organizational context in terms of what stakeholders are part of the project, where in the hierarchy the CLS is located, and what level of mandate the CLS has. The scope will also set the terms for how transports are managed through the CLS. If for instance there is limited space at site, this can imply that time-planned deliveries are favoured. 

In answering RQ2, it was found that as a consequence of what transport management approach is chosen, the structure of the CLS will differ. This dissertation shows that asset-based setups are similar to traditional logistics outsourcing and TPL in which physical distribution services are offered. Non-asset based services on the other hand act more as supply chain orchestrators similar to fourth-party logistics service providers. In these cases, supplied services are aimed more at ensuring that the right services and capabilities can be procured for the CLS. One value-adding service that was found crucial to include in CLS’s is a joint booking and planning system. Having this type of support systems will allow the CLS to coordinate the different stakeholders connected to the CLS. Related to the structure of the CLS, RQ3 suggest that performance needs to be monitored for deliveries, on-site logistics, and the coordination of logistics activities on and off site. The performance monitoring needs to be developed from a logistics point-of-view, taking into consideration the different stakeholders’ perspectives. 

Finally, in answering RQ4, it was found that a CLS can affect the identified challenges positively. In essence, a CLS aims at managing construction logistics and if developed and implemented from this notion, transports to and from site as well as on-site logistics management can become more efficient. Additionally, the dissertation shows that CLS’s can help in managing the interorganizational relationships within the construction project(s). However, this builds on the notion of having well-developed and communicated service offerings and regulations, e.g. through business and governance models. 

It was also found that the activities of the framework are interrelated and dependent on one another, suggesting that developing construction logistics setups is an iterative process. The proposed framework should thus be seen as a guideline for how to develop the setup, allowing for adaptations of the setup to the context for which it is developed.

Abstract [sv]

Med pågående urbaniseringstrend finns det ett ökat behov av att bygga bostadshus, sjukhus, skolor och infrastruktur i stadsområden för att möta de ökande behoven. Samtidigt ses mark allt mer som en ändlig resurs. Detta har lett till att avvecklad industriell mark tas i anspråk för förtätning och storskaliga stadsutvecklingsprojekt där flera enskilda byggprojekt byggs i närliggande områden under samma tidsperiod. Byggprojekt produceras dock på konsumtionsplatsen vilket innebär att stora mängder material och resurser måste levereras till och tas bort från varje byggarbetsplats. Detta leder i sin tur till att nya transportflöden skapas i samband med stadsutveckling. Dessa måste samordnas för att säkerställa effektiv byggproduktion samtidigt som transporternas miljömässiga och sociala påverkan på det urbana transportsystemet kan minskas. Samtidigt är det viktigt att byggarbetsplatserna kan hanteras ur ett logistikperspektiv utan försämrad effektivitet på grund av det urbana läget.

Ett sätt att hantera logistiken till och från byggprojekt inom stadsutveckling är genom så kallade bygglogistiklösningar (BLL). Dock påverkar införandet av BLL många olika intressenter och de interorganisatoriska relationer dem emellan. Införandet av BLL ställs därför inför tre utmaningar; att hantera transporter till och från byggprojekt, att hantera logistiken på byggarbetsplatser och att samordna de interorganisatoriska relationerna mellan byggprojektets intressenter. Utvecklandet av BLL utgår ofta från tidigare lösningar då det i nuläget saknas riktlinjer för hur man kan utveckla och implementera lösningarna. För att minska den här ad hoc-strategin för utvecklandet av BLL är syftet med denna avhandling att föreslå ett ramverk för att utveckla bygglogistiklösningar. Syftet uppnås med hjälp av följande forskningsfrågor:

FF1:   Utifrån olika intressenters perspektiv, varför implementeras bygglogistiklösningar?

FF2:   Vilken typ av bygglogistiktjänster erbjuds?

FF3:   Hur kan bygglogistiklösningars prestanda mätas?

FF4:   Hur påverkas de tre identifierade utmaningarna av implementeringen av bygglogistiklösningar? Hur påverkar bygglogistiklösningar de identifierade utmaningarna med att hantera transporter till och från byggprojekt, att hantera arbetsplatslogistiken och att samordna de interorganisatoriska relationerna mellan byggprojektets intressenter?

För att besvara forskningsfrågorna har tre huvudmetoder använts; litteraturgranskningar för studiernas bakgrund och att utveckla analytiska ramverk, och fallstudieforskning och Delphi-forskning för de empiriska studierna.

I uppfyllandet av syftet föreslår avhandlingen att tre aktiviteter måste övervägas när man utvecklar en BLL; 1. fastställa omfattningen av BLL, 2. besluta om BLL-strukturen och 3. hantera interorganisatoriska relationerna i BLL. Dessa aktiviteter är grunden för det utvecklade ramverket. Innehållet i aktiviteterna härleddes genom forskningsfrågorna.

I besvarandet av FF1 befanns att entreprenörer implementerar BLL:er för att säkerställa byggproduktivitet, byggherrar implementerar BLL:er för att minska störningar för företag och boende i närheten, och kommuner implementerar BLL:er för att minska störningar för tredje part och för att minska påverkan från bygglogistik på det urbana transportsystemet. De identifierade drivkrafterna för att implementera BLL:er kommer även att påverka BLL:ens struktur. Avhandlingen visar att BLL-strukturen är beroende av kontextuella överväganden med avseende på arbetsplatsens fysiska egenskaper samt vad som byggs, såväl som den organisatoriska kontexten med avseende på vilka intressenter som är del av projektet, var i hierarkin BLL:en placeras och vilken mandatnivå BLL:en har. BLLomfattningen sätter även villkoren för hur transporter hanteras i projektet. Om utrymmet exempelvis är begränsat kan detta innebära att tidsplanerade leveranser premieras.

I besvarandet av FF2 befanns det att en konsekvens av hur transporthanteringen läggs upp så kommer BLL-strukturen att påverkas. Den här avhandlingen visar att fysiska logistiklösningar liknar traditionell outsourcing av logistik och TPL där fysiska distributionstjänster erbjuds. Icke-fysiska logistiklösningar fungerar mer som försörjningskedjeorkestratorer och påminner om fjärdepartslogistiktleverantörer. I dessa fall syftar de erbjudna tjänsterna mer till att säkerställa att rätt tjänster och kapacitet kan erbjudas genom BLL. En värdeadderande tjänst fanns vara en grundförutsättning för BLL:er, nämligen gemensamma boknings- och planeringssystem. Ett sådant system hjälper BLL-operatören i koordinationen av de olika intressenterna som är kopplade till BLL:en. I framtagandet av BLL-strukturen föreslår FF3 även att logistikprestanda måste följas upp i processerna leveranser, arbetsplatslogistik och samordning av logistikaktiviteter på och utanför byggarbetsplatsen. Prestationsutvärderingen måste utvecklas ur ett logistikhänseende med hänsyn tagen till de olika intressenternas perspektiv.

Slutligen, i besvarandet av FF4, befanns att en BLL kan påverka de identifierade utmaningarna positivt. I grund och botten syftar en BLL till att hantera bygglogistik och om BLL:en utvecklas och implementeras utifrån detta synsätt kan transporter till och från byggarbetsplats samt logistikhantering på plats bli effektivare. Vidare visar avhandlingen att BLL:er kan hjälpa till att hantera de interorganisatoriska relationerna inom byggprojekten. Detta bygger dock på att man har väl utvecklade och kommunicerade serviceerbjudanden med tillhörande regelverk för hur service skall användas. Dessa bör kommuniceras genom affärs- och styrningsmodeller. Det konstaterades också att ramverkets aktiviteter är inbördes relaterade och beroende av varandra, vilket tyder på att utvecklandet av bygglogistiklösningar är en iterativ process. Det föreslagna ramverket bör därför ses som riktlinjer för hur man utvecklar BLL, vilket möjliggör för anpassningar av lösningen till det sammanhang för vilken den utvecklas.

Place, publisher, year, edition, pages
Linköping: Linköping University Electronic Press, 2020. p. 92
Series
Linköping Studies in Science and Technology. Dissertations, ISSN 0345-7524 ; 2091
Keywords
Construction logistics, Construction logistics setups, Third-party logistics
National Category
Transport Systems and Logistics
Identifiers
urn:nbn:se:liu:diva-170231 (URN)10.3384/diss.diva-170231 (DOI)9789179298067 (ISBN)
Public defence
2020-11-13, Online and TPM55, Täppan, Norrköping, 09:00 (English)
Opponent
Supervisors
Funder
Svenska Byggbranschens Utvecklingsfond (SBUF), 13605
Available from: 2020-10-14 Created: 2020-10-09 Last updated: 2021-12-29Bibliographically approved

Open Access in DiVA

fulltext(672 kB)844 downloads
File information
File name FULLTEXT01.pdfFile size 672 kBChecksum SHA-512
00b1923a0ecf449e6357dc20d6e89460628127fd6ed1e02854049adc1c942e48c27a33f94f7698b700574dddda010b0a8d00f4ea3e6e700d0255071f712992b5
Type fulltextMimetype application/pdf

Other links

Publisher's full textScopus

Authority records

Janné, MatsRudberg, Martin

Search in DiVA

By author/editor
Janné, MatsRudberg, Martin
By organisation
Communications and Transport SystemsFaculty of Science & Engineering
In the same journal
Production planning & control (Print)
Transport Systems and Logistics

Search outside of DiVA

GoogleGoogle Scholar
Total: 921 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

doi
urn-nbn

Altmetric score

doi
urn-nbn
Total: 342 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • oxford
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf