liu.seSearch for publications in DiVA
1112131415161714 of 75
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • oxford
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Circular material flows: Challenges and enablers in new build and renovation projects
Linköping University, Department of Science and Technology, Communications and Transport Systems. Linköping University, Faculty of Science & Engineering.ORCID iD: 0009-0006-5499-6853
2026 (English)Licentiate thesis, comprehensive summary (Other academic)
Abstract [en]

Construction logistics can be described as the process of coordinating the movement of goods and information from their origin to the point of use within a construction context. In a circular economy (CE), retaining the value of materials across multiple use phases depends not only on the physical management of materials, but also on the availability and coordination of information regarding their production, use, and end-of-use (EoU) management.

Actors seeking to integrate circular materials into production or sales channels require information on available supply for planning, while those managing EoU materials require knowledge of potential demand to enable efficient reverse logistics. Information sharing is therefore essential for matching supply and demand and for planning circular material flows. From this perspective, logistics management plays a key role in enabling circularity at scale, particularly in the construction industry—the largest generator of waste in the European Union. In this context, construction logistics related to construction and demolition waste management (C&DWM) constitutes a critical lever for enabling circular material flows.

Focusing on C&DWM, this thesis investigates logistics-related activities, challenges, and enablers associated with the reutilization of construction materials and products in Swedish new-build and renovation projects. Through semi-structured interviews and case studies, the three studies included in this thesis examine how actors involved in construction logistics perceive circularity, how logistics activities support the reutilization of materials and products, and which challenges and enablers influence their implementation. The thesis addresses the following research questions:

RQ1:

How do actors involved in construction logistics perceive circularity, their role, and the challenges and enablers associated with increasing circular material flows?

RQ2:

What logistics activities can support operations for circular material flows?

Taken together, the findings indicate that enabling circular material flows depends on coordinating not only physical logistics activities, but also information, incentives, and actors across projects, markets, and system levels.

Place, publisher, year, edition, pages
Linköping: Linköping University Electronic Press, 2026. , p. 100
Series
Linköping Studies in Science and Technology. Licentiate Thesis, ISSN 0280-7971 ; 2031
Keywords [en]
Construction logistics, Circular material flows, Circular economy, Construction and demolition waste, Circular construction supply chains, Supply chain coordination
National Category
Construction Management
Identifiers
URN: urn:nbn:se:liu:diva-222471DOI: 10.3384/9789181185331ISBN: 9789181185324 (print)ISBN: 9789181185331 (electronic)OAI: oai:DiVA.org:liu-222471DiVA, id: diva2:2050874
Presentation
2026-05-08, TP2 Täppan, Campus Norrköping, Norrköping, 10:15 (English)
Opponent
Supervisors
Note

Funding: Swedish Innovation Agency (Vinnova) through the research project BÖRjA (grant no. 2023-00519); Ragnar Sellberg Foundation

Available from: 2026-04-07 Created: 2026-04-07 Last updated: 2026-04-07Bibliographically approved
List of papers
1. Circular construction logistics for retaining value of waste material in new build projects
Open this publication in new window or tab >>Circular construction logistics for retaining value of waste material in new build projects
2024 (English)Conference paper, Oral presentation with published abstract (Other academic)
Abstract [en]

The construction industry is the largest contributor of waste in the EU, and research shows that a high sorting rate does not automatically entail a high recycling rate. The purpose of this study is, through a multiple case study, to provide better understanding of the waste flows and the prerequisites on the logistical operations within new build construction projects, considering the variation over time (construction phases). Waste data from five projects were analyzed. Results show that amount and mix of waste varieties vary considerably during a project, which has to be effectively managed by the waste logistics system.

Place, publisher, year, edition, pages
Barcelona, Spain: International Annual EurOMA Conference, 2024
Keywords
Construction logistics, Waste flows, Resource utilization
National Category
Construction Management Transport Systems and Logistics
Identifiers
urn:nbn:se:liu:diva-202994 (URN)
Conference
EurOMA 2024: Transforming people and processes for a better world
Projects
BÖRjA
Funder
Vinnova
Available from: 2024-04-23 Created: 2024-04-23 Last updated: 2026-04-07

Open Access in DiVA

fulltext(4597 kB)10 downloads
File information
File name FULLTEXT01.pdfFile size 4597 kBChecksum SHA-512
e1e395e8559f36280441431240b1cf970b44c3a184288fc2737f9da90e29db8a3fa5ffa0660048a65bcd9fd26bbb1c38b25d086fd669df35acc1b3cd744381bc
Type fulltextMimetype application/pdf
Order online >>

Other links

Publisher's full text

Authority records

Åkerberg, Amanda

Search in DiVA

By author/editor
Åkerberg, Amanda
By organisation
Communications and Transport SystemsFaculty of Science & Engineering
Construction Management

Search outside of DiVA

GoogleGoogle Scholar
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

doi
isbn
urn-nbn

Altmetric score

doi
isbn
urn-nbn
Total: 109 hits
1112131415161714 of 75
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • oxford
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf