Construction logistics in urban development is inherently complex and increasingly managed through construction logistics set-ups operated by thirdparty logistics providers. In many large projects, such set-ups are mandated by municipalities rather than voluntarily adopted by project actors. This paper examines how a municipality-mandated construction logistics set-up shapes coordination, inter-organizational relationships, and on-site logistics practices in a large urban development project. The study is based on a qualitative single case study of Stockholm Royal Seaport, drawing on document analysis, observations, interviews, and a multi-actor workshop. The findings show that the mandated construction logistics set-up operates primarily as a regulatory boundary condition rather than as an integrative coordination mechanism. Although formal control over logistics is centralized, responsibility for coordination remains dispersed among project actors and is enacted through a combination of formal procedures and informal, relational practices. Consequently, on-site logistics practices evolve through continuous local adaptation to constraints, limited system visibility, and fragmented responsibilities. The paper contributes to construction logistics research by demonstrating how municipality-mandated construction logistics set-ups reconfigure coordination at key organizational and operational interfaces, highlighting tensions between centralized control and distributed coordination in urban development projects.