liu.seSearch for publications in DiVA
Planned maintenance
A system upgrade is planned for 17/11-2026, at 12:00-13:00. During this time DiVA will be unavailable.
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • oxford
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Conceptual model for aligning construction logistics capacity through simulation
LUT Univ, Finland.
Linköping University, Department of Science and Technology, Communications and Transport Systems. Linköping University, Faculty of Science & Engineering.ORCID iD: 0000-0003-4572-4080
Linköping University, Department of Science and Technology, Communications and Transport Systems. Linköping University, Faculty of Science & Engineering.ORCID iD: 0000-0001-7494-8134
2025 (English)In: Automation in Construction, ISSN 0926-5805, E-ISSN 1872-7891, Vol. 175, article id 106190Article in journal (Refereed) Published
Abstract [en]

The flows of materials arriving at, and waste moving out of a site, require detailed planning for smooth logistic processes. This is underscored by the temporal and spatial limitations around sites, characterized as a pure bottleneck. This paper proposes a conceptual data framework for developing digital twins for logistics capacity planning in construction to align the capacities for (i) incoming materials, (ii) on-site material handling, and (iii) material dispatching from the site. The framework is tested based on quantitative mapping of transport arriving, departures, and movements on-site, from two real-world planned projects. This mapping is then used for testing construction site layout planning (CSLP) scenarios of capacity dimensions through simulations. Ultimately, this paper proposes a first step to integrate transport plans in CSLP. Practitioners can use the model for planning sites for smooth material flows and properly dimensioning loading and unloading area capacities to avoid bottlenecks in logistic operations.

Place, publisher, year, edition, pages
ELSEVIER , 2025. Vol. 175, article id 106190
Keywords [en]
Logistics capacity planning; Simulation; Construction logistics; Site layout planning; Conceptual modeling
National Category
Construction Management
Identifiers
URN: urn:nbn:se:liu:diva-213415DOI: 10.1016/j.autcon.2025.106190ISI: 001471802000001Scopus ID: 2-s2.0-105002419071OAI: oai:DiVA.org:liu-213415DiVA, id: diva2:1956170
Note

Funding Agencies|Swedish Innovation Agency (Vinnova) [2023-00519]

Available from: 2025-05-05 Created: 2025-05-05 Last updated: 2026-01-20

Open Access in DiVA

fulltext(4551 kB)86 downloads
File information
File name FULLTEXT01.pdfFile size 4551 kBChecksum SHA-512
ab64bf0f49810226398901c09dc467181bf446d9afdfc94635f63a5e269aa93d387636836c62adc3f43cd9d056d5070dbed562f6e96d58f8998225d09a76eaa9
Type fulltextMimetype application/pdf

Other links

Publisher's full textScopus

Search in DiVA

By author/editor
Brusselaers, NicolasFredriksson, Anna
By organisation
Communications and Transport SystemsFaculty of Science & Engineering
In the same journal
Automation in Construction
Construction Management

Search outside of DiVA

GoogleGoogle Scholar
Total: 87 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

doi
urn-nbn

Altmetric score

doi
urn-nbn
Total: 133 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • oxford
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf