Cost overruns of infrastructure projects - distributions, causes and remedies
Linköping University, Department of Science and Technology, Communications and Transport Systems. Linköping University, Faculty of Science & Engineering. Swedish Transport Adm, Sweden.ORCID iD: 0000-0003-1789-9238
2025 (English)In: Transportation Research Part A: Policy and Practice, ISSN 0965-8564, E-ISSN 1879-2375, Vol. 198, article id 104532Article in journal (Refereed) Published
Abstract [en]

This paper analyses the accuracy of cost estimates for Swedish transport infrastructure projects 2004-2022, discusses causes of cost overruns, and suggests remedies. Cost estimates for all projects in the national investment plans 2010-2022 are tracked from early planning to completion. Final costs for all projects finished 2004-2022 are compared to decision-to-build cost estimates. Results show considerable cost escalation during the planning stages, on average, while cost estimates at the decision-to-build are close to final costs, on average. Cost escalations during the planning stage are not uniform, however: the distribution of cost changes is highly skewed with a long right tail. The reason that final costs tend to exceed early cost estimates is that project decisions are effectively locked in before projects' costs and benefits have been thoroughly assessed. Lock-in of premature decisions does not only cause cost overruns; even worse, it distorts project selection and design, reduces incentives to search for more cost-efficient designs, and increases opportunities and incentives for project beneficiaries to underestimate costs and overestimate benefits. Several ways to tackle these problems are suggested.

Place, publisher, year, edition, pages
PERGAMON-ELSEVIER SCIENCE LTD , 2025. Vol. 198, article id 104532
Keywords [en]
Cost overruns; Transport infrastructure; Project management; Decision processes; Transport policy
National Category
Economics
Identifiers
URN: urn:nbn:se:liu:diva-214879DOI: 10.1016/j.tra.2025.104532ISI: 001503646000001Scopus ID: 2-s2.0-105007005918OAI: oai:DiVA.org:liu-214879DiVA, id: diva2:1971277
Available from: 2025-06-17 Created: 2025-06-17 Last updated: 2025-09-22

Open Access in DiVA

fulltext(3022 kB)198 downloads
File information
File name FULLTEXT01.pdfFile size 3022 kBChecksum SHA-512
22d83366313c6da5923a4573edfaf6ffb75bf92c6403fc20bb7e78c62f5480c35bcf9eb5624e5e42705a0430520af28570bbf13fbc7e51802a93e29bbdb8dddd
Type fulltextMimetype application/pdf

Other links

Publisher's full textScopus

Search in DiVA

By author/editor
Eliasson, Jonas
By organisation
Communications and Transport SystemsFaculty of Science & Engineering
In the same journal
Transportation Research Part A: Policy and Practice
Economics

Search outside of DiVA

GoogleGoogle Scholar
Total: 198 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

doi
urn-nbn

Altmetric score

doi
urn-nbn
Total: 193 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • oxford
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf