liu.seSearch for publications in DiVA
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • oxford
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Analyzing Operational Efficiency and Planning Practices in Rail Maintenance Facilities: A Value Stream Mapping Case Study of a Wagon Maintenance Depot with Recommendations for Improved Efficiency
Linköping University, Department of Management and Engineering, Production Economics.
Linköping University, Department of Management and Engineering, Production Economics.
2026 (English)Independent thesis Advanced level (degree of Master (Two Years)), 20 credits / 30 HE creditsStudent thesisAlternative title
Utvärdering av operativ effektivitet och planeringspraxis för underhåll av tågvagnar (Swedish)
Abstract [en]

This Master’s thesis investigates operational efficiency and planning practices within rail maintenance facilities, focusing specifically on wagon maintenance at Green Cargo’s depot in Eskilstuna. Rail freight serves as a climate-smart alternative as the transport sector faces pressure to decarbonize, but its competitiveness relies on both operational availability and precision, ensuring that wagons are maintained correctly and available when needed. Maintenance operations in this sector are characterized by high task variability and uncertainty in demand, which can challenge operational efficiency. The study applies an adaptive Value Stream Mapping (VSM) approach to visualize physical and information flows. On-site observations and semi-structured interviews with planning and workshop personnel were conducted to provide a detailed mapping and analysis of operational processes. In addition, historical repair data from 2025 was analyzed to identify patterns in repair frequency and variation across different wagon types.

The findings indicate that maintenance lead times are strongly influenced by structural constraints within the workshop layout, resource dependencies and administrative interruptions rather than the technical execution of repairs alone. Entry and exit occur at the same end, which together with specialized tracks, limited brake testing equipment, restricted shunting flexibility, creates positional dependencies and recurring bottlenecks. High-frequency repair categories such as brake and welding work further contribute to significant variability in processing times. Administrative approval procedures linked to predefined price ceilings and limitations in material handling further reduce flow continuity and visibility of operational performance. Operational and strategic recommendations include constraint-based inflow planning, SMED-based task externalization and expanded resource capacity for brakes and welding. The study also suggests improving digital monitoring and exploring future standardized flow-oriented workshop layouts. The study concludes that maintenance stability requires an integrated systems perspective. Effective coordination of layout, planning and resources is essential to reduce lead times and boost fleet availability.

Place, publisher, year, edition, pages
2026. , p. 121
Keywords [en]
Railway maintenance, freight wagon maintenance, value stream mapping, maintenance planning, production flow, process efficiency, bottleneck analysis, lead time reduction, maintenance efficiency, rail freight, Lean production
National Category
Industrial engineering and management
Identifiers
URN: urn:nbn:se:liu:diva-224791ISRN: LIU-IEI-TEK-A--26/05357--SEOAI: oai:DiVA.org:liu-224791DiVA, id: diva2:2070728
External cooperation
Green Cargo
Subject / course
Production Economics
Presentation
2026-06-03, SH63, Olaus Magnus väg 36, Linköping, 15:15 (Swedish)
Supervisors
Examiners
Available from: 2026-06-12 Created: 2026-06-12 Last updated: 2026-06-12Bibliographically approved

Open Access in DiVA

fulltext(6557 kB)197 downloads
File information
File name FULLTEXT01.pdfFile size 6557 kBChecksum SHA-512
75f813579b58d4ae753c28df91127ac08ac698ee33e4aeb6828efc29d76f60c42b4e454d063e771b19912501c82fda9945e1ecf765d1ca02b7f7a42ad70bc522
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
Olsson, MiltonStrid, Jacob
By organisation
Production Economics
Industrial engineering and management

Search outside of DiVA

GoogleGoogle Scholar
Total: 197 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 134 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • oxford
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf