Developments in computational hardware and simulation software have come to apoint where it is possible to use whole mission simulation in the preliminary design.This paper address some key issues needed to realize this. These are, systemsimulation using distributed solvers for robust large scale simulation, time scalecompression to deal with the widely different time scales involved, e.g. the transientbehaviour of control surface actuators, to the tracking of fuel consumption. Theapplication is a flight simulation model with subsystems such as control surfaceactuators. In this way it is possible to do real time simulation (RTS) and faster thanreal time simulation (FRTS) of rather complex systems.